$4,719.00

Qty:

By Raypak


Details

Top

Model # 009271

Alternate Part #'s BR406AENC, 017374, RAY017374

Product Description

Elevation: 0 Ft. – 2000 Ft. Click Here for High Altitude Pool

ASME Pool Heaters
Raypak offers its complete line of residential gas heaters in an ASME version. Raypak has state inspectors on-site daily performing certifications for their pool and commercial boiler production that may require ASME. Being in the boiler business for over 50 years truly makes Raypak the leader for your commercial needs.

Why ASME?
Some local codes require that public pools, pools that are in a condominium and apartment or other commercial application be ASME certified. ASME stands for American Society of Mechanical Engineers. They are a non-profit group which sets many industrial and manufacturing standards. A pool heater that is made to ASME standards will perform to a set of specifications as determined by ASME, specifically in relation to the operating water pressure the appliance can handle. Each and every ASME heat exchanger that goes into a Raypak heater is certified by a state inspector to make sure it complies with the ASME code for that particular product.

Cast Iron Glass-lined Header
Raypak applies its years of commercial boiler experience to the design of its cast iron glass-lined headers. A metal header design allows for the higher working pressures required by ASME. All ASME headers are inspected upon arrival at Raypak and each lot (pour date) tested by an independent laboratory. Only after the material passes stress analysis and metal composition tests is it approved for use in an ASME unit.

All Copper Fin Tube Heat Exchanger
All Raypak RP2100 ASME gas heaters come standard with .065" wall integral copper finned tubes. This tubing is over 50% thicker in wall thickness than standard tubing. Since the fins are integral to the tube, maximum heat transfer is attained. The fin tubing is made from one piece of extruded copper tube, not from separate fins attached to the copper tubes. Every RP2100 has the same robust design tube bundle that is used in Raypak's large gas commercial boilers. Built to last, built Raypak tough.

CPVC 2" Water Connections
Standard with every RP2100 is a set of 2" slip fit CPVC water connections to make your installation secure and effortless. These couplings screw into the 2" flanged header. You can also direct plumb your copper pipe into the flanged header.

Condensation Protection
Standard on all RP2100 models is Raypak's Unitherm Governor, which is like an automatic bypass. The Unitherm Governor automatically regulates the water flow to help keep the water temperature in the heat exchanger above 105°F.

Hi Flow Rates
No need to worry about large pumps or high flow systems. The RP2100 comes with an automatic bypass built into the header. The RP2100 can handle up to 125 GPM.

ISO 9001
Raypak is proud to be a ISO 9001 registered manufacturing plant. One more reason why Raypak is number onein the heater industry today.

End-of-Line Test
Every Raypak gas pool heater is plumbed and test fired before it is put in the carton. This ensures that your heater will fire right out of the box and continue to give you years of trouble-free operation.

Quality Checkpoints
The Raypak assembly process includes 6 final assembly quality checkpoints that help to ensure that each and every Raypak RP2100 is built correctly, and built to last.

CSA Certified
All of Raypaks products are CSA certified. The RP2100 is tested by CSA to the ANSI Z21.56 standard.


Warranty:

Product Specifications

BTU:
406,000 BTU
Ignition:
Electronic
Certification:
ASME
Heater Type:
Natural Gas
Manufacturer:
Raypak
Heat Exchanger:
Copper
Top

?     Asked on 1/16/2012by Guest

Will a gas heater operate at the low speed of a dual speed motor?
 Reply

A  Answered on 1/16/2012 by InyoPools Product Specialist Patrick P.

Probably not - Most gas heater will shut off at low GPM levels (20-40) to keep the heater cores from overheating - 20 for 200 BTUs, 40 for 400 BTUs. Depending on your pool system you might get these GPM levels at the low speed but generally these heaters must be run at the motor's high speed.
 Reply


?     Asked on 10/10/2012by Guest

What is the difference between an Electronic and Millivolt ignition?
 Reply

A  Answered on 10/10/2012 by InyoPools Product Specialist Patrick P.

The basic answer is that Millivolt is the old style of ignition, using a standing pilot light. While the electronic ignition uses a spark start system like a gas grill. Electronic ignitions are more efficient in gas usage and also are better suited for high wind areas where a pilot light might get extinguished.
 Reply


?     Asked on 10/10/2013by Guest

What is A.S.M.E. ?
 Reply

A  Answered on 10/10/2013 by InyoPools Product Specialist Patrick P.

A.S.M.E., stands for American Society of Mechanical Engineers. This group has laid out certain design criteria that would protect it’s industry and insures that products meets all ASME standards. Some states or counties may require the use of A.S.M.E. heat exchangers usedin pool heaters. The ASME copper finned tubes are thicker than the standard copper finned tubes used on residential pool heaters.
 Reply


?     Asked on 5/3/2017by David

What's the difference between this model and the Raypak 406 NG ele - PR 406AEN PN 009219? Also, how fast could either one of the models ship? Thanks
 Reply

A  Answered on 5/4/2017 by InyoPools Product Specialist Lennox H.

Hi, David. The ASME units have cast iron headers which are used for commercial swimming pool and spa uses. The non-ASME units like p/n 009219 have polymer headers and those units are for residential swimming pool and spa uses. Both units are in stock and will ship after 24hrs of receiving the order.
 Reply


?     Asked on 6/22/2017by Inyo Visitor

Is this Cupro Nickel and do you have an instalation partner in Massachusetts
 Reply

A  Answered on 6/27/2017 by InyoPools Product Specialist Lennox H.

Hi. The Cupro-Nickel unit model # is 010201, we do not have any installation partners in MA. You can contact Raypak @ 805-278-5300 or visit raypak.com
 Reply


Top
Difficulty

Est. Repair Time

4 to 8 hrs

Tools Needed

Screwdriver, Nut Drivers, Pliers, Wrench Set

5     0

Our legacy RayPak heater was EOL. We had a good 15 years out of it and wanted a relatively easy retrofit scenario

Written on 12/2/2016 by Guest

I purchased the new RayPak unit from INYO Pools and since this was a commercial installation, I hired a certified HVAC guy to help me install it. I had gotten a ridiculous $6,700 quote locally to complete this project from another company. With the online purchase from INYO (include a new exhaust stack) I was able to get the whole thing done for just over $2,400. Needless to say, the Condo Association was very pleased with the savings.... Incidentally, I priced this same unit with 2 other sites and INYO's price was the best. Their video featuring freight receiving advice was also quite helpful. I would not hesitate to use INYO again.

Were these instructions helpful? 
 

Top

Review Summary

 (Average 4  out of 5 stars)
1 Ratings
5 star:
 
(0)
4 star:
 
(1)
3 star:
 
(0)
2 star:
 
(0)
1 star:
 
(0)